Bracegrade Project: Kilshane
Project Type: SHELTERED HOUSING
Project Specifics
This development consisted of the construction of 66 one and two storey semi-detached affordable houses and 33 senior citizens dwellings together with major civil engineering works including a football pitch and construction of a Clubhouse for Finglas Celtic.
Major civils element included:
- Bulk excavation
- Main sewer and main water pipline realignment
- 500m of 1500mm diameter culvert
- 500m of 450mm diameter watermain
- 500m of road and footpath
- Installation of a sewage pumping station
- Laying a football pitch
- 500m of wall and railings around the full perimeter
House specification included:
- Hardwood windows and doors
- Gas fired heating
- Brick/ render facades
Other work involved:
- Construction of large retention structures in concrete in high gradient areas
- Construction of a clubhouse using a prefabricated system building
Bracegrade Limited performed the role of Project Supervisor Construction Stage (PSCS).
Bracegrade Ltd - Why choose us?
Our strong reputation since foundation in 1990.
Our collaborative and proactive approach to meeting our client’s needs on every project.
Our consistent delivery across many successful projects.