Bracegrade Project: Old Distillery
Project Type: Residential
Project Specifics
This project consisted of the refurbishment of existing distillery into 84 apartments and the construction of 95 apartments at Beresford Street. Works to the distillery included:
- Removal of brick vaulted ceilings
- Installation of precast concrete floors
- Steel structure to penthouse with metal roof and copper cladding
- Aluminium windows
Works to the new building included:
- Underground carpark
- Aluminium windows
- Zinc cladding
- Extensive hard and soft landscaping
Bracegrade Limited performed the role of Project Supervisor Construction Stage (PSCS).
Bracegrade Ltd - Why choose us?
Our strong reputation over the last 30 years.
Our collaborative and proactive approach to meeting our client’s needs on every project.
Our consistent delivery across many successful projects.