Project Specifics
The project consisted of the construction of 30 apartments (2,400m2), four retail units (1,100m2), a forum office, ESB Substation and Shangan Nursery (330m2).
The site was located on a bus turning circle and green area at Shangan Road. The turning circle was relocated and the road re-aligned allowing us to determine the site and then progress with the construction of the buildings.
Work comprised of the following:
- Relocation of bus turning circle
- Road realignment
- Construction of 30 apartments (2,400m2)
- Construction of four retail units (1,100m2)
- Construction of a forum office
- Construction of Shangan Nursery (330m2)
- Structure of the nursery was timber framed construction with rendered block outer leaf, metal roofing and alu-clad timber windows.
- Design and enforcement of all traffic management
- Detailed external Landscaping as part of the overall Ballymun regeneration program.
Apartment Specification:
- The building was predominantly 3 storey with a 4 storey frontispiece.
- The construction was traditional construction with loadbearing blockwork from first floor up. The structure below was insitu concrete.
- Floors are insitu concrete/ precast slab
- Roof is flat PC roof with a water proof membrane
- External walls above ground floor are predominantly block cavity wall construction with integral colour render.
- Windows are alu clad timber windows
- Internal walls are stud partitions
- Electric night storage heating
- Fitted kitchens
- Framed guardings to balconies
- Secure carparking to rear
Bracegrade Limited performed the role of Project Supervisor Construction Stage (PSCS).
Bracegrade Ltd - Why choose us?
Our strong reputation since foundation in 1990.
Our collaborative and proactive approach to meeting our client’s needs on every project.
Our consistent delivery across many successful projects.